1-4 DAYS DELIVERY
Ferrari F8 F142M MSY Style Autoclave Carbon Fiber Door Sills 2019-2024
Couldn't load pickup availability
100% ORIGINAL & HIGH-QUALITY
1-YEAR WARRANTY
Description
Description
Upgrade the entry detail of your 2019-2024 Ferrari F8 with these MSY Style Autoclave Carbon Fiber Door Sills, designed to add a refined, premium, and performance-inspired carbon fiber accent.
These door sills are made specifically for Ferrari F8 applications, enhancing the lower door entry area with a clean MSY Style design. The autoclave carbon fiber finish adds a high-end motorsport-inspired detail while complementing the F8’s exotic interior and exterior styling.
Available in DRYCF, 1X1DRYCF, and DRYFGCF material options, these door sills are ideal for F8 owners looking for a premium carbon fiber replacement upgrade with original screw hole installation compatibility.
Product Specifications
| Vehicle | Ferrari F8 |
| Chassis | F142M |
| Model Years | 2019-2024 |
| Product Type | Door Sills |
| Style | MSY Style |
| Material Options | DRYCF, 1X1DRYCF, DRYFGCF |
| Condition | Brand New |
| Package Contents | One pair of door sills |
| Part Number | F8-MAN-MSY-DS |
| Installation | Replacement installation using original screw holes |
Key Features
- Designed for 2019-2024 Ferrari F8 models
- MSY Style door sills add premium carbon fiber detail to the entry area
- Autoclave carbon fiber styling provides a refined performance-inspired finish
- Available in DRYCF, 1X1DRYCF, and DRYFGCF material configurations
- Enhances the lower door opening with clean carbon fiber detailing
- Replacement-style design installs using original screw holes
- Complements the Ferrari F8’s exotic cabin and exterior carbon fiber styling
- Pairs well with carbon fiber interior trim, side skirts, front bumper vents, quarter panel side scoops, diffusers, and other Ferrari F8 upgrades
Configuration Options
- DRYCF: Dry carbon fiber option for a lightweight, premium carbon fiber finish.
- 1X1DRYCF: 1x1 weave dry carbon fiber option for a distinctive premium carbon pattern.
- DRYFGCF: Dry fiberglass carbon fiber option for a carbon-style finish with reinforced structure.
Package Includes
- One pair of door sills
Note: Professional installation is recommended for proper alignment, secure mounting, and best overall fitment. Pre-order items may require production before shipping, with air shipping estimated at 5-6 weeks and container shipping estimated at 3-4 months.
Installation
- Replacement-style door sill installation
- Designed to use original screw holes
- Test fitting is recommended before final installation
- Door sill alignment and mounting points should be checked before securing the components
- Professional installation is recommended for proper fitment and secure mounting
Fitment
- 2019-2024 Ferrari F8
Shipping Policy
Shipping Policy
United States: Free shipping available to the lower 48 states across all items. Other states will incur a shipping charge.
Worldwide: Free shipping is available for Complete Headlights, Taillights, DRLs. For custom headlight retrofits, carbon fiber products, and performance products, there will be a shipping charge.
Please note:
• For Retrofits, you are purchasing a headlight modification service.
• If you select "Shipping own headlights to BayOptiks for modification", you are required to send us your headlights.
• If you choose "Purchase new OEM headlights", we will order and modify a new OEM headlight for you.
• Once your customizations are complete, we will ship it to you!
Turnaround Time
Turnaround Time
- Complete Headlights: 3-5 business days for order processing plus shipping time.
- Custom & Pre-Built Headlights: 6-8 weeks depending on the complexity and component availability.
- New OEM and cores: 6-8 weeks plus an additional 4-8 weeks as these are special orders base on the vehicle VIN due to different versions (North American, European, etc.)
- DRLs, Taillights, Brake Pads, and Carbon Fiber Aero: 3-5 business days for order processing, plus shipping time.
- Lens Replacements: 1-3 weeks plus shipping time.
Please note, we do not have control over the time frames of our vendors, manufacturers, and delivery services as they may delay processes in regards to components and shipment.

