1-4 DAYS DELIVERY
2004-2021 Subaru WRX STi | 02-14 WRX Impreza T-304 Up-Pipe
Couldn't load pickup availability
100% ORIGINAL & HIGH-QUALITY
1-YEAR WARRANTY
Description
Description
The Extreme Online Store Up-Pipe has been made with beefy local raw materials. The flex joint is 321 Stainless Steel w/ an Interlocking Liner and tubing is a heavy-duty 14 Gauge 304 Stainless Steel that has been CNC Mandrel Bent and finished up with a nice brushed finish. Their flanges are made out of 1/2" 304 Stainless Steel and are fully machined on all sides. The insides of their flanges are "cut-back" to allow the pipe to rest inside the flange which gives you a nice flush mating surface thus allowing optimal flow through the pipe.
Professional Installation is Recommended
Flexibility: 2015-2021 Subaru WRX STi
Shipping Policy
Shipping Policy
United States: Free shipping available to the lower 48 states across all items. Other states will incur a shipping charge.
Worldwide: Free shipping is available for Complete Headlights, Taillights, DRLs. For custom headlight retrofits, carbon fiber products, and performance products, there will be a shipping charge.
Please note:
• For Retrofits, you are purchasing a headlight modification service.
• If you select "Shipping own headlights to BayOptiks for modification", you are required to send us your headlights.
• If you choose "Purchase new OEM headlights", we will order and modify a new OEM headlight for you.
• Once your customizations are complete, we will ship it to you!
Turnaround Time
Turnaround Time
- Complete Headlights: 3-5 business days for order processing plus shipping time.
- Custom & Pre-Built Headlights: 6-8 weeks depending on the complexity and component availability.
- New OEM and cores: 6-8 weeks plus an additional 4-8 weeks as these are special orders base on the vehicle VIN due to different versions (North American, European, etc.)
- DRLs, Taillights, Brake Pads, and Carbon Fiber Aero: 3-5 business days for order processing, plus shipping time.
- Lens Replacements: 1-3 weeks plus shipping time.
Please note, we do not have control over the time frames of our vendors, manufacturers, and delivery services as they may delay processes in regards to components and shipment.

